Bathroom with a glass walk-in shower, freestanding tub and wood vanity

indoor project · San Antonio

Bathroom Remodeling Contractor in San Antonio

Bathroom remodels and updates involving showers, tile, waterproofing, flooring, vanities, fixtures, lighting, storage, painting, and finish work included in the approved project.

  • Shower & tile work
  • Waterproofing and surface preparation
  • Fixtures, vanity & finish work

About the service

What you see at the end depends on what happens before the tile goes up.

Bathroom remodeling combines several different surfaces and components in a relatively small space. Substrate preparation, waterproofing, tile layout, transitions, fixture locations, vanity dimensions, flooring, and finish details all need to work together.

Before estimating the project, we clarify which existing components are being removed, which will remain, and which materials and fixtures the homeowner plans to use.

The scope then defines demolition, preparation, installation, painting, trim, and other included work so the project is based on actual selections rather than an undefined “bathroom remodel.”

Completed shower with textured tile, recessed niches, glass doors, and grab bars by Shpak Construction Group
Shower · Waterproofing · Tile · Vanity · Flooring · Fixtures

Project options

What can be included in a bathroom remodeling project?

Before the estimate, think through the visible elements you want to keep, replace, or add to the bathroom.

01

Wall & floor tile

Choose whether you want tile on the shower walls only, the bathroom floor, or both, along with the size, color, style, and pattern you prefer.

02

Shower features

Add niches, shelves, a bench or seat, grab bars, or other features you want incorporated into the shower.

03

Shower door

Choose the general type and appearance of the shower door you want for the finished space.

04

Vanity & mirror

Keep the existing vanity or mirror, refinish them where applicable, or replace them with customer-selected units.

05

Fixtures & lighting

Choose the visible shower fixtures, faucets, shower head, bathroom hardware, and light fixtures you want included in the remodel.

06

Walls & ceiling paint

Keep the existing wall and ceiling colors or choose a new paint direction to complete the updated bathroom.

Have a similar project in mind?

REQUEST AN ESTIMATE

Our process

Six clear steps from project direction to final walkthrough.

  1. 01

    Share the project details

    Send your address, bathroom photos, approximate dimensions, and the result you want. Before the estimate, have a general direction for the tile, shower features, shower door, vanity, mirror, visible fixtures, lighting, and paint.

  2. 02

    Schedule the estimate

    Once the main visible selections and project direction are developed enough for a meaningful estimate, we schedule an on-site visit.

  3. 03

    Verify the bathroom

    During the visit, we measure the space and review the existing shower or tub, tile areas, flooring, vanity, fixtures, lighting, access, and other visible conditions that affect the remodel.

  4. 04

    Receive the written estimate

    You receive a written scope identifying the included remodel components and project responsibilities. Once approved, your deposit reserves the project in our schedule.

  5. 05

    Prepare for the remodel

    After reservation, we provide the payment schedule. Before the start date, the selected tile, fixtures, vanity, shower door, colors, and other visible project details should be confirmed and available as required by the approved scope. Material delivery and any specialized trade work are coordinated as applicable to the individual project.

  6. 06

    Remodel & final walkthrough

    We complete the approved bathroom remodel, cleanup, and final walkthrough.

Before the estimate

What should you know before requesting a bathroom remodeling estimate?

You do not need every exact product purchased, but the major visible choices should already have a clear direction before the estimate.

Send your property address, several photos of the existing bathroom, approximate dimensions, and any inspiration images or product links that show what you want to achieve.

Please be ready to discuss:

  1. 01

    Tile areas

    Will tile be installed on the shower walls only, on the bathroom floor, or on both?

  2. 02

    Tile style

    Have a general tile size, color, style, and pattern in mind. Photos or links to products you are considering are helpful.

  3. 03

    Shower features

    Decide whether you want shelves, a niche, bench or seat, grab bars, or other visible shower features.

  4. 04

    Shower door

    Know the general shower door type and appearance you want. If you already have a specific model in mind, send the product link.

  5. 05

    Vanity

    Are you keeping the existing vanity, refinishing it where applicable, or replacing it?

    If replacing it, have the approximate size and general style selected.

  6. 06

    Mirror & storage

    Will the existing mirror, medicine cabinet, or bathroom storage remain, or do you want any of these items replaced?

  7. 07

    Visible plumbing fixtures

    Have a general direction for the faucet, shower fixtures, shower head, and other visible plumbing components you want.

  8. 08

    Lighting

    Decide whether the existing bathroom lighting stays or whether fixtures will be replaced.

  9. 09

    Walls & ceiling

    Let us know whether the walls and ceiling will be repainted and whether you plan to keep the current colors or change them.

  10. 10

    Inspiration & priorities

    Send reference photos showing the overall bathroom style you prefer and point out which elements are most important to you.

Pricing

Bathroom remodeling pricing

Guest bathroom remodeling labor — starting at $4,980

This starting price covers labor only. Final labor pricing depends on the project scope, plumbing changes, surface preparation, and the features being replaced or added.

Once the general design direction, materials, and desired scope are established, we can prepare an estimate based on the actual project.

REQUEST AN ESTIMATE

Before & after

See what changes when a bathroom is rebuilt properly.

Bathroom renovations often involve much more than replacing the visible finishes. These projects reveal the full change—from demolition and preparation to tile installation, fixtures, and final details.

Bathroom before remodeling with a tub, shower curtain, wood vanity, and existing floor tile
Before
Bathroom after remodeling with a tiled shower, glass doors, dark vanity, and new floor tile
After

Project 01

Bathroom before remodeling with a bathtub beside a separate framed shower enclosure
Before
Bathroom after remodeling with a large tiled walk-in shower, glass enclosure, recessed niche, and mosaic shower floor
After

Project 02

Frequently asked

Useful answers before you request an estimate.

What bathroom-remodeling work can you include?

Depending on the project, our scope may include demolition, substrate preparation, waterproofing, tile, vanity installation, fixtures, trim, painting, and other finish work. Every included item is listed in the written estimate.

Who purchases the tile, fixtures, vanity, and grout?

The client normally selects and purchases the visible finish materials because these choices depend on personal preference. Product links and specifications should be sent before purchase so dimensions, quantities, compatibility, and delivery timing can be reviewed.

Is shower glass included in the bathroom-remodeling scope?

Shower glass is not supplied or installed by Shpak Construction Group. We can provide contact information for glass companies previously used by our clients, but the homeowner contracts with the glass company separately.

Who handles plumbing or electrical changes?

New plumbing or electrical circuits and other licensed-trade work must be performed by the appropriate licensed professional. When this work is required, its responsibility and coordination are identified in the estimate.

What happens if water damage or other hidden problems are found during demolition?

Concealed damage cannot be confirmed until the affected area is opened. We document the condition and provide the added scope and price for approval before completing repairs that were not included in the original estimate.

Is shower waterproofing included?

When we rebuild a tiled wet area, the approved scope identifies the substrate and waterproofing work to be completed before tile installation. Waterproofing is not replaced by tile or grout and is listed as part of the shower assembly rather than treated as an optional cosmetic step.

Read our 6-month limited workmanship warranty

REQUEST AN ESTIMATE

Tell us about your bathroom remodeling project.

Include wide photos, approximate dimensions, material or finish ideas, access notes, and the components you may want included.

Your request and photos are saved securely in the private site dashboard.Review our Privacy Policy (opens in a new tab) and Terms & Conditions (opens in a new tab).

What our clients say about us

Review 1 of 5, Joseph P.
Top