Low composite deck with broad steps and dark railings beside a stone house

Outdoor project · San Antonio

Composite Deck Builder in San Antonio

New composite decks, complete rebuilds, and resurfacing for suitable existing frames. We coordinate the structure, decking layout, borders, fascia, stairs, railings, skirting, and finish details as one complete outdoor project.

  • TrexPro Gold & TimberTech Pro
  • New decks, rebuilds & resurfacing
  • Written project scope & applicable manufacturer documentation

About the service

A lasting composite deck starts below the surface.

Composite decking eliminates the recurring sanding and staining associated with traditional wood decking, but the visible boards are only one part of the project. The framing below them directly affects how the finished deck looks, feels, and performs over time.

For a new deck or complete rebuild, framing is coordinated with the board direction, borders, stairs, railings, fascia, skirting, and other finish details. For resurfacing, the existing structure must first be reviewed for condition, flatness, joist spacing, blocking, and suitability for continued use.

Trex, TimberTech, and other composite decking systems have product-specific requirements for spacing, fastening, gapping, fascia, and installation details. Your written estimate connects the selected material direction with the actual work required, including demolition, framing, decking, stairs, railings, finish details, hauling, and other included components.

Low composite deck with broad steps and dark railings beside a stone house
Composite decking · Framing & blocking · Borders · Fascia & skirting · Stairs · Railings

Project options

What can be included in a composite deck project?

Not every deck requires every component. These are the main elements we coordinate when preparing the project scope.

01

Composite decking & board layout

Select the manufacturer, product line, color, and board profile. Board direction — parallel or perpendicular to the house — is also considered because it affects the finished appearance, borders, transitions, and framing layout.

02

Framing & blocking

New framing or an existing substructure is reviewed for condition, flatness, joist spacing, blocking, border support, and compatibility with the selected decking layout.

03

Borders, fascia & skirting

Picture-frame borders and breaker boards create finished transitions. Fascia covers exposed perimeter framing, while optional skirting can provide a cleaner finished appearance below the deck.

04

Steps & landings

Treads, risers, landings, width, and placement are planned around deck height, everyday access, railing locations, and the connection between the deck and yard.

05

Railings

Railing systems are coordinated with deck height, stairs, post locations, sight lines, decking colors, and the overall project layout.

06

Benches, lighting & additional details

Built-in benches, gates, step lights, post lights, and other features can be incorporated when their location and requirements are planned before installation.

Have a similar project in mind?

REQUEST AN ESTIMATE

Our process

Six clear steps from project details to final walkthrough.

  1. 01

    Share the project details

    Send your address, photos of the existing deck or area, approximate dimensions, and the result you want to achieve. Let us know whether you are considering a new deck, rebuild, or resurfacing, along with your main choices for size, decking, stairs, railings, skirting, benches, and other features.

  2. 02

    Schedule the estimate

    Once we review the information and confirm that the project direction is clear, we schedule a free on-site estimate when needed.

  3. 03

    Verify the site

    During the visit, we confirm measurements, deck height, access, existing conditions, and other details that affect the project. For resurfacing, we also evaluate the accessible existing framing for potential reuse.

  4. 04

    Receive the written estimate

    You receive a clear written scope identifying the included deck components, materials, responsibilities, and payment stages. Once approved, your deposit reserves the project in our schedule.

  5. 05

    Prepare for the project

    When required, we help provide project information for HOA or City paperwork. After the necessary approvals are addressed, we order the materials for the scheduled project.

  6. 06

    Build & final walkthrough

    We complete the approved deck project, cleanup, and final walkthrough. When applicable, we also register the manufacturer warranty for the installed decking products.

Before the estimate

What should you know before requesting a free composite deck estimate?

You do not need every final detail selected, but you should already have a general direction for the project.

Before scheduling, send us your property address, several photos of the existing deck or area, and a brief description of what you would like to change.

Please be ready to discuss:

  1. 01

    Deck size & shape

    Will the new deck stay approximately the same size and shape, or are you considering a different footprint, height, or layout?

  2. 02

    Composite product line & color

    Review Trex, TimberTech, or Deckorators options and narrow your preference to a product line or two to three colors you like.

  3. 03

    Railings

    Will the project include railings? If yes, consider the general style or material you prefer.

  4. 04

    Steps & access

    Consider whether steps are needed, where they should be located, and the general configuration you prefer.

  5. 05

    Bench & built-in features

    Let us know if you would like a built-in bench, gate, lighting, or another feature and its approximate location.

  6. 06

    Skirting

    Decide whether you prefer the underside of the deck open or finished with skirting and what general color direction you prefer.

  7. 07

    Board direction

    Consider whether you prefer the decking boards to run parallel or perpendicular to the house.

Pricing

Composite deck pricing

Starting priceComposite deck labor — from $15 / sq. ft.

This starting price covers labor only. Detailed pricing is available through a project-specific estimate.

Your final price depends on deck size and height, framing, decking collection, railings, and steps.

Send project photos, dimensions, and your address for a tailored estimate.

REQUEST AN ESTIMATE

Before & after

See real composite deck transformations.

Every deck starts with different conditions. Some projects require complete demolition and new framing, while others may be suitable for resurfacing after the existing structure is reviewed.

These before-and-after projects show how layout, material selection, structural work, and finish details come together in the completed deck.

Project 01

Project 02

Project 03

Frequently asked

Useful answers before you request a composite deck estimate.

What types of composite deck projects do you take on?

We build new composite decks, complete deck rebuilds, and selected resurfacing projects where the existing frame can be retained. The written estimate identifies whether the project includes demolition, framing, decking, stairs, railings, fascia, skirting, or other finish details.

Can you install composite boards over my existing wood frame?

In most cases, we recommend rebuilding the frame before installing new composite decking. Composite boards can last 25 years or more, and an older wood frame may have much less service life left. Many older frames were built to different standards and need to be replaced to meet current building codes and the decking manufacturer’s requirements for joist spacing and support. We assess the existing frame before recommending a plan.

What additional Trex labor warranty may be available through TrexPro Gold?

For eligible registered residential installations by a TrexPro Gold contractor, Trex covers reasonable labor to remove, replace, and dispose of products with a covered defect. For Signature, Transcend, Select, and Refuge, the terms are 4 years for decking or railing, 6 years for both, and 8 years for both with eligible Trex fasteners. For Enhance, the corresponding terms are 2, 3, and 4 years. Shpak Construction Group registers eligible installations. Trex determines coverage under its published terms.

Read the TrexPro limited labor warranty

What warranty applies to Trex, TimberTech, and Deckorators materials?

The manufacturer provides the applicable limited product warranty. Coverage and terms vary by brand, product, and collection. We identify the selected products in your estimate so you can check the warranty for your decking, railing, and other materials.

What replacement labor warranty may apply to a TimberTech project?

Shpak Construction Group participates in the TimberTech PRO program at the Member tier. For qualifying registered residential installations, TimberTech’s limited warranty may cover replacement labor for a covered product defect. The Member tier provides 5 years for qualifying Premium decking with TimberTech fasteners or qualifying Premium railing, and 6 years when the qualifying decking, fasteners, and railing are installed together. The Base terms are 3 and 5 years, respectively. A qualifying full TimberTech aluminum framing system may add 10 years. Eligibility depends on the products, installation date, components, and registration of both warranties.

Read the TimberTech replacement labor warranty

Do I need to choose the composite brand and color before requesting an estimate?

You do not need every detail finalized, but narrowing the choice to a brand, collection, and several colors helps us prepare a more realistic estimate. We work with composite systems such as Trex, TimberTech, and Deckorators and verify the installation requirements for the selected product.

Are railings, stairs, fascia, and skirting automatically included?

These components are included when they are listed in your written estimate. We install ready-made metal railing systems that are suitable for the structure. If you have a system in mind, send us the product link so we can review it.

Can you build a two-level deck with a lower level I can use when it rains?

Yes. We can install the Trex® RainEscape® drainage system beneath the upper deck boards. It channels rainwater into gutters and downspouts, helping keep the space below dry and usable when it rains. Shpak Construction Group is a Trex RainEscape Certified Installer in San Antonio. The drainage system comes with a 25-year limited manufacturer’s warranty.

Ready to start your composite deck project?

Tell us about your composite deck project.

Your request and photos are saved securely in the private site dashboard.Review our Privacy Policy (opens in a new tab) and Terms & Conditions (opens in a new tab).

What our clients say about us

Review 1 of 5, Joseph P.
Top